Markleeville Water Company (MWC) has published a Request for Proposals (RFP) for Engineering Services for Water System Planning and Improvements. The engineering services will be funded by a $435,000 planning grant from the California State Water Resources Control Board Drinking Water State Revolving Fund (SRF).
MWC now has a signed Funding Agreement with the State for this grant. The planning grant project will include a comprehensive evaluation of the MWC distribution system to address failures and issues with disinfection byproducts. Note: this is partially due to the worn, interior surfaces of the existing steel pipes. Replacing them with modern piping will help decrease these issues.
The Project includes preparation of construction documents to the 75% complete level, preparation of environmental review documents, preparation of documents required to apply for the SRF construction grant, and grant administration.
Proposals are due no later than 4:00 p.m. Thursday, August 22nd, 2019. Click here to view and download the RFP.